Document Library
Applications
Supplemental Permit Documents
- Building Permit Application - Contact Sheet
- Building Permit Application - Zoning Compliance Sheet
- City of Aspen Electric Load Form - Application for Service
- Contractor Affidavit
- Fireplace OR Woodstove Registration
- Homeowner Association Compliance Form
- IFFR Permit Policy
- IFFR Agreement
- Line Grade Verification Form
- Owner Builder Affidavit
- Special Inspection Agreement
- Valuation Affadavit
- 2019 City of Aspen Electric Load Form - Application for Service - Final 12-03-2019
Checklists & Instructions
- Asbestos Checklist
- Building Checklist - IBC (Commercial and Multifamily Projects)
- Building Checklist - IRC (Single Family, Duplex, and Townhome Projects)
- Building Submittal Guide - IBC (Commercial and Multifamily Projects)
- Building Submittal Guide - IRC (Single Family, Duplex, and Townhome Projects)
- Residential Zoning Checklist
- Commercial Zoning Checklist
- COA Solar Contractors Guidelines
- EPIC Permit Checklist
- Minimum Building Submission
- Multi-family Alteration Cheatsheet
- Pools & Spas Checklist
- Roof-Reroof Checklist (PDF)
- Tenant Finish Cheatsheet
- Tent Permit Checklist
Electronic Permit Submissions
Fee Schedules
- 2015 IECC Renewable Energy Mitigation Program Calcuations
- Building Permit Fees (PDF)
- Building Permit Fee Estimator
- COA Residential Tap Fee Estimator
- Electrical Permit Fees (PDF)
- Fire Permit Fees (PDF)
- Mechanical Permit Fees (PDF)
- Parks Review Fees (PDF)
- Plumbing Permit Fees (PDF)
- Planning Review Fees (PDF)
- Zoning Review Fees (PDF)
-
Building
Physical Address
130 S Galena St
3rd Floor
Aspen, CO 81611
Phone: 970-920-5090
Permit Fees Estimator Tools
- Example floor area calcs, demo calcs, etc.
- Sign Permit
- Fence Permit
- Address Change Request
Engineering Policy
- Engineering Fees are located in Section 2.12.100 of the City of Aspen Municipal Code
- For assistance calculating affected area, please refer to the Affected Area Definition Policy. For further assistance, contact the Engineering Department.
- Utility Fees (including Water Tap Fees and the Electric Community Investment Fee) are in Title 25